SHUAIBA Project

IMG_0161
IMG_0157
IMG_0143

PROJECT OVERVIEW

The main aim of Shuaiba project is to connect the old desalination plant to the new one, the two plants are 2.5 KM far away from each other, and the electrical cables should be extended and protected by a concrete trench. This massive (4.5 X 2500 LM) concrete trench was under EMECO’s scope, EMECO executed the de-watering, excavation, foundations, trenches casting, membrane proofing, and backfilling.

In this project, EMECO saved 2 months of the scope baseline, by designing and fabricating steel molds to cast the trench in the site.

 

Details

  • Client: Trevi –ASC
  • Year: 2018
  • Project Duration : 8 months