In King Abdulaziz Road Project, our scope was to build a metro station, of 4 stories, the project was one of a kind with a 4-meter depth slab! and 2.5-meter width walls! The steel rebars used were with big dimensions 32 and 40 mm, and we used mechanical and regular couplers to connect the rebars to each other.

 

The density of the steel was very high, and the works performed in this project are considered to be one of the most complex civil works at all, casting is still ongoing, and we cast around 70,000 cubic meters so far

Details

  • Client: NESMA Partners Contracting Co.
  • Year: 2018
  • Duration: Ongoing